Showing posts with label matson hill. Show all posts
Showing posts with label matson hill. Show all posts

Sunday, July 17, 2011

Revised Matson Hill Map


A revised map of Matson Hill has been posted displaying the new small IMBA reroute near the parking lot.

Sunday, March 6, 2011

Matson Hill Workday This Saturday March 12th - 9-1pm

When: Saturday, March 12th , 2011, from 9:00~1:00.

What: We’re having the first workday in St. Charles County Parks for the Spring 2011 season at Matson Hill Park.

Where: From the Highway 40/94 interchange,
• Take Highway 94 South for 7.4 miles to F (turn right on F).
• Stay on F for 3 miles, then turn left on Stub Road. Follow Stub Road for ~.5 miles to gate, and follow directions from there. Or,
Click this for a Google map link. Clicking the green bike will give you the “get directions” link. (For some reason, the last instruction just has you turning left off of F, without naming the road. That's Stub Road.)

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail. Please read through pilznr’s “What to expect at a workday” post, available via this link; http://gorctrails.com/board/topic.asp?TOPIC_ID=3711. It will also give you some hints on how to prepare for a workday.

Why: To continue the new trail expansion on the Hayes Property. We’ll continue the trail that will eventually lead to the back portion of the park. This is Phase Two of a multi phase project, eventually utilizing 400+ acres of new Park property.

The pic shows the next phase to be completed, in green, the eight switchback climb, in orange, and the proposed leg that goes up to Duke Road, in red. This will add ~ 3 miles of trail to the 4.9 that's currently out there, but doesn't include the western portion of the property.



Please RSVP via ONE of the following (to make sure we bring enough food):
  • The St. Charles County Park's (SCCP) office [636-949-7535],
  • through the WebTrac registration system on the parks website, http://parks.sccmo.org/parks/
  • or on this thread.

GORC & St. Charles County Parks will provide: Trail building tools, instructions on trail building, safety guidelines, and lunch.

NOTICE: In case of bad weather, please call the St. Charles County Parks (SCCP's) Trail Hotline (636-949-7475, option #2). SCCP's will only leave a message about the workday if it's cancelled.

Saturday, August 28, 2010

New Matson Map

Ron has updated the Matson map reflecting all of GORC's progress expanding the Matson Hill trail system. See the new map here.

Thursday, May 27, 2010

Final 2010 Spring Workday/National Trails Day- June 5th

National Trails Day must have originated somewhere other than Missouri, since it's usually pretty warm to be still  building trail by June. The purpose of the event is mostly to celebrate having trails in the first place, but it seems like we've always ended up having some sort of workday on it. This year is no exception.

We're having the last workday of the spring at Matson Hill on June 5th, with the goal being to complete a section of trail that will make a loop by tying back in to the original trail. If that doesn't happen, you'll have to be content to ride the original trail, plus an out-and-back on the newest section until you reach the sign saying it's time to turn around. Please come out and lend a hand if you can. More details and a sign-up thread are available here.

Sunday, May 16, 2010

Matson Hill - May 22nd Workday 9-1pm



When:
Saturday, May 22nd, 2010. From 9:00~1:00.

What: We're having the 3rd of four workdays this spring at Matson Hill Park, and everyone is invited. Mountain bikers, hikers, and trail runners are all welcome, so don’t be bashful about showing up.

This is the continuation of a multi-year project, and we hope to TRIPLE OR QUADRUPLE the current trail mileage at Matson by the time we’re finished.

Where:

From the Highway 40/94 interchange,
• Take Highway 94 South for 7.4 miles to F (turn right on F).
• Stay on F for 3 miles, then turn left on Stub Road. Follow Stub Road for ~.5 miles to gate, and follow directions from there. Or,
• Click this for a Google map link. Clicking the green bike will give you the “get directions” link. (For some reason, the last instruction just has you turning left off of F, without naming the road. That's Stub Road.)

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail. It’s also a good idea to read through pilznr’s “What to expect at a workday” post, available via this link; http://gorctrails.com/board/topic.asp?TOPIC_ID=3711

Why: To add more multi-use single track (natural surface) trail to the existing Matson loop. This is Phase One of a multi phase project, eventually utilizing 400+ acres of new Park property.

Please RSVP via ONE of the following (to make sure we bring enough food):
• The St. Charles County Park's (SCCP) office [636-949-7535],
• through the WebTrac registration system on the parks website, http://parks.sccmo.org/parks/
• or on this thread.

GORC & St. Charles County Parks will provide: Trail building tools, instructions on trail building, safety guidelines, and lunch.

Bring your bike or trail shoes if you want to try what you built after lunch.

NOTICE: In case of bad weather, please call the St. Charles County Parks (SCCP's) Trail Hotline (636-949-7475, option #2). SCCP's will only leave a message about the workday if it's cancelled.

Monday, March 15, 2010

Matson Hill Workday- Saturday, March 20th

When: Saturday, March 20th, 2010. From 9:00~1:00.

What: We're having the 1st of four workdays this spring at Matson Hill Park, and everyone is invited. Mountain biker, hikers, and trail runners are all welcome, so don’t be bashful about showing up.

This is the continuation of a multi-year project, and we hope to TRIPLE OR QUADRUPLE the current trail mileage at Matson by the time we’re finished.

Where:
From the Highway 40/94 interchange,
• Take Highway 94 South for 7.4 miles to F (turn right on F).
• Stay on F for 3 miles, then turn left on Stub Road. Follow Stub Road for ~.5 miles to gate, and follow directions from there. Or,
Click this for a Google map link. Clicking the green bike will give you the “get directions” link. (For some reason, the last instruction just has you turning left off of F, without naming the road. That's Stub Road.)

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail. It’s also a good idea to read through the “What to expect at a workday” post. Bring your bike or trail shoes if you want to try what you built after lunch.

Why: To add more multi-use single track (natural surface) trail to the existing Matson loop. This is Phase One of a multi phase project, eventually utilizing 400+ acres of new Park property.

Please RSVP via ONE of the following (to make sure we bring enough food):
The St. Charles County Park's (SCCP) office [636-949-7535];  through the WebTrac registration system on the parks website, http://parks.sccmo.org/parks/; or on this thread.

GORC & St. Charles County Parks will provide: Trail building tools, instructions on trail building, safety guidelines, and lunch.

NOTICE: In case of bad weather, please call the St. Charles County Parks (SCCP's) Trail Hotline (636-949-7475, option #2). SCCP's will only leave a message about the workday if it's cancelled.

Monday, December 14, 2009

Matson Hill Workday- Sat. Dec. 19th

Saturday, December 19th, 2009. From 9:00am-1:00pm.

We're having the last workday of the year at Matson Hill Park, and everyone is invited. 

This is the continuation of a multi-year project, and we hope to TRIPLE OR QUADRUPLE the current trail mileage at Matson by the time we’re finished.

Please note that we are not parking at the main Matson Trailhead/parking lot.

Directions from the Highway 40/94 interchange:
• Take Highway 94 South for 7.4 miles to F (turn right on F).
• Stay on F for 3 miles, then turn left on Stub Road. Follow Stub Road for ~.5 miles to gate, and follow directions from there. 

• You can also click this for a Google map link. Clicking the green bike will give you the “get directions” link. 

You will want to bring gloves, sturdy shoes, eye protection, and something to drink on the trail. It’s also a good idea to read through the article “What to expect at a workday” .

Please RSVP via ONE of the following (to make sure we bring enough food):

GORC & St. Charles County Parks will provide: Trail building tools, instructions on trail building, safety guidelines, and lunch (menu still TBD, but rumored to be Bekin’s chicken chili).